Kinerja Unit

Data operasional tanggal 2026-05-31

Reset

Unit #1

RUNNING
Gross Load 0
Net Load 0
Coal 0
49%
EAF
51%
EFOR
49%
CF
1.41
SFC NET

Unit #2

SHUTDOWN
Gross Load 0
Net Load 0
Coal 0
0%
EAF
100%
EFOR
0%
CF
0.00
SFC NET

Plant

Gross Load 0
Net Load 0
Coal 0
25%
EAF
75%
EFOR
25%
CF
1.41
SFC NET
Unit #1: Derating 49% terkait Vacum condensor low/alarm
Unit #2: Shutdown terkait perbaikan kebocoran pada BFP 2A

Equivalent Availability Factor (EAF)

Equivalent Forced Outage Rate (EFOR)

Capacity Factor (CF)

Specific Fuel Consumption (SFC)

Bad
3552.68 kCal/kg
HHV Coal Site Analysis
>6000
Good
4500-6000
Medium
3500-4500
Warning
<3500
Bad
3.8 MW
Aux Power
23.4%
Aux %
-80.9 kPa
Vacuum
5010.5 kCal/kWh
NPHR
3811.8 kCal/kWh
GPHR
0%
SOF
1.07
SFC Gross
Bad
3552.68 kCal/kg
HHV Coal Site Analysis
>6000
Good
4500-6000
Medium
3500-4500
Warning
<3500
Bad
0 MW
Aux Power
0%
Aux %
0 kPa
Vacuum
0 kCal/kWh
NPHR
0 kCal/kWh
GPHR
0%
SOF
0
SFC Gross
Bad
3552.68 kCal/kg
HHV Coal Plant Analysis
>6000
Good
4500-6000
Medium
3500-4500
Warning
<3500
Bad
3.8 MW
Aux Power
23.4%
Aux %
-80.9 kPa
Vacuum
5010.5
NPHR
3811.8
GPHR
0%
SOF
1.07
SFC Gross